How we work

Seven steps from your first call to handover and the defects period after it. Where a step ends with something you hold, it is set beside the step.

The steps

  1. 01

    Enquiry

    Call, send a WhatsApp or fill in the quotation form. Tell us what you need, where, and by when. Attach drawings, a bill of quantities or a list if you have them.

    You receive

    A named contact at Elevion and a date for the site visit.

    Proposed
  2. 02

    Site visit

    We visit, measure, photograph and ask the questions a price depends on: access, ground, services, approvals.

    You receive

    Site notes, and a list of anything still needed to price.

  3. 03

    Quotation

    We price the work from the site notes and your documents, and list what the price excludes.

    You receive

    The line-by-line quotation.

    Proposed
  4. 04

    Contract and programme

    A written contract with payments tied to stages of work, and a programme with dates for each stage.

    You receive

    The signed contract and the programme.

  5. 05

    Works

    Mobilisation, a safety induction for everyone on site, and full-time supervision while work is in progress.

    You receive

    A monthly progress report.

    Proposed
  6. 06

    Handover

    We inspect the work with you, list anything to put right, close the list, and hand over.

    You receive

    The handover file: as-built notes, test certificates and warranties.

  7. 07

    Defects period

    After handover we come back to put right any defect that appears during the period written into your contract.

    You receive

    A defects period in writing.

    Proposed

On site

Supervised full time, while work is in progress.

A supervision team is on site full time during construction, checking the work against the specification, the budget and the programme.

Safety

  • A safety induction for everyone before they start on site
  • Helmets, boots and high-visibility clothing for everyone on site
  • Signs and flag controllers wherever work runs beside a live road

Quality

  • Work checked against the drawings and specification
  • Material testing on road works
  • A joint inspection with you before handover
Three workers in helmets and high-visibility vests checking a block wall
A licensed photograph, not an Elevion site.

BIM

A model where it pays.

Building information modelling turns the design into data the whole team uses. It pays on buildings with many services in tight spaces, or where quantities drive the budget. Ask us whether yours is one of them.

What the model is used for

  • Quantity take-offs from the model, for pricing at each design stage
  • Visualisation, so you see the building before it is built
  • Clash detection between structure and services
  • Field layout: site logistics and the building's footprint
  • Scheduling: sequencing trades and showing progress

Next step

Tell us about the job.

Send drawings, a bill of quantities or a list if you have them. Tell us where and by when.

We reply to every enquiry within one working day.Proposed